Tigh-na-Cladach Case Study

A development of 15 low-energy houses for first-time buyers, which includes the first social Passive House in the UK.

Scotstoun House Case Study

The adaptation and extension of a poorly performing but listed 1960’s office building to provide a BREEAM Excellent and EPC A-rated building

Fairfield Housing Case Study

The 15-year regeneration of a housing estate in Perth where a holistic approach to sustainability led to the establishment of the housing co-operative

Natural Power Offices

An office where two-thirds of the timber used in its construction was grown on the client’s estate, and which is powered by the client’s hydro scheme.

Glenalmond Street Case Study

A small scheme of 16 affordable homes in the East End of Glasgow which features a a variety of renewable technologies

Morgan Academy

Reconstruction of a fire-damaged landmark building in Dundee, which highlights the powerful link between building conservation and sustainable design.

Maryfield Housing

A development of 28 private sector homes where sustainability was incorporated from the beginning of the procurement and design process.

Scroll to top